Project Talpas - Dolj County
Dolj County · Reference RDR-2026-003
Summary
20 MW / 80 MWh utility-scale battery energy storage at nearly RTB Stage
Technical profile
- Project type
- BESS
- BESS capacity
- 80.0 MWh
- BESS power
- 20.0 MW
- Development stage
- Permitting
- Land surface
- 1.0 ha
- Land rights
- Superficies (30y)
Grid connection
- Status
- Grid Connection Permit pending
- Distance to grid
- ~ 0.2 km
Permits & consents
- Urbanism certificate (CU)
- Obtained
- Zoning plan (PUZ)
- Not Required
- Environmental
- Obtained
- Building permit
- Pending
- Natura 2000 overlap
- No
Description
The project is expected to obtain the Grid Connection Approval (ATR) in June 2026. The solution study has already been approved by the CTE Commission of Distribuție Energie Electrică Oltenia, the grid operator.
The grid connection will be implemented through a T-connection to a 110 kV transmission line located approximately 200 meters from the land where the battery energy storage system (BESS) will be developed.
In order to obtain the building permit for BESS, the only remaining requirement is the removal of the land from agricultural use, which is currently in progress. We estimate that the project will obtain the building permit in August 2026.