BESS permitting

Project Talpas - Dolj County

Dolj County · Reference RDR-2026-003
Request detailed teaser →
Summary

20 MW / 80 MWh utility-scale battery energy storage at nearly RTB Stage

Technical profile
Project type
BESS
BESS capacity
80.0 MWh
BESS power
20.0 MW
Development stage
Permitting
Land surface
1.0 ha
Land rights
Superficies (30y)
Grid connection
Status
Grid Connection Permit pending
Distance to grid
~ 0.2 km
Permits & consents
Urbanism certificate (CU)
Obtained
Zoning plan (PUZ)
Not Required
Environmental
Obtained
Building permit
Pending
Natura 2000 overlap
No
Description
The project is expected to obtain the Grid Connection Approval (ATR) in June 2026. The solution study has already been approved by the CTE Commission of Distribuție Energie Electrică Oltenia, the grid operator. The grid connection will be implemented through a T-connection to a 110 kV transmission line located approximately 200 meters from the land where the battery energy storage system (BESS) will be developed. In order to obtain the building permit for BESS, the only remaining requirement is the removal of the land from agricultural use, which is currently in progress. We estimate that the project will obtain the building permit in August 2026.