RDR
Renewable Dealroom
← Back to all projects
Hybrid permitting

Project Giurgeni - Ialomita County

Ialomita County · Reference RDR-2026-007
Request detailed teaser →
Summary

203 MWp Wind Farm + 58 MWp PV + 322 MWh BESS with Grid Connection Permit

Technical profile
Project type
Hybrid
PV capacity
58.0 MWp
BESS capacity
322.0 MWh
BESS power
80.5 MW
Wind capacity
203.0 MW
Development stage
Permitting
Land surface
81.0 ha
Land rights
Superficies (30y)
Grid connection
Status
Grid Connection Permit issued
Voltage
400 kV
Distance to grid
~ 6.4 km
Permits & consents
Urbanism certificate (CU)
Obtained
Environmental
Obtained
Building permit
Pending
Natura 2000 overlap
No
Description
Hybrid project consisting of wind, photovoltaic panels, and BESS, developed in the south-eastern area of Romania. The Grid Connection Approval (ATR) has already been obtained, and the building permit is expected to be obtained no later than August 2026. The grid connection solution is based on connection to an existing 400 kV / 110 kV substation owned by Transelectrica. The hybrid project will have its own 400 kV transformer substation, which will be connected to the Transelectrica substation through a 6.4 km underground cable route.
Request detailed teaser

Request the teaser for RDR-2026-007

We will prepare and send the detailed teaser to your inbox within 1-2 business days. All information remains strictly confidential.